Aluminum Tubing Size Chart | NPS, OD And Schedule Data

A standard tubing dimension table lists NPS, outer diameter, wall thickness, and schedule numbers for common aluminum alloys.

The 1/2-inch pipe you ordered isn’t 0.5 inches across — it’s 0.840 inches. That’s why referencing an aluminum tubing size chart before you buy saves time, money, and a return trip to the supplier. This guide covers the NPS-to-OD mappings, Schedule 40 and 80 wall thicknesses, alloy tempers, and the exact steps to measure and select the right tube for structural, architectural, or general-purpose work.

What Do The Numbers On A Tubing Chart Mean?

Every row on an aluminum tubing size chart anchors on three values: Nominal Pipe Size (NPS), Outer Diameter (OD), and wall thickness determined by the Schedule number. NPS is a nominal label — it does not match the actual OD. A 1/2-inch NPS pipe, for example, measures 0.840 inches OD. The Schedule (SCH40, SCH80, or SCH160) sets how thick the wall is, which also controls pressure rating and weight per foot. Tubing that isn’t pipe — round, square, or rectangular — skips NPS entirely and lists OD × wall directly, governed by ASTM specifications.

NPS Pipe Schedule Dimensions For SCH40 And SCH80

The two most common schedules for aluminum pipe are Schedule 40 (standard wall) and Schedule 80 (heavy wall). The table below shows NPS from 1/8-inch up through 10-inch with their actual OD and wall thickness values. Always check the OD against your fittings — NPS alone is misleading.

NPS OD (inches) SCH40 Wall (inches) SCH80 Wall (inches)
1/8″ 0.406 0.068 0.095
1/4″ 0.540 0.088 0.119
1/2″ 0.840 0.109 0.147
1″ 1.315 0.133 0.179
2″ 2.375 0.154 0.218
4″ 4.500 0.237 —
6″ 6.625 0.280 —
10″ 10.750 0.365 —

Per the Chalco Aluminum NPS and schedule reference, SCH160 is also available for 1/2″ NPS with a 0.188-inch wall. For sizes above 4″, SCH80 becomes less common in standard aluminum stock.

How Do You Measure Aluminum Tubing Correctly?

Measuring rectangular or square tube requires three dimensions: height, width, and wall thickness. For round tubing, measure the OD with a caliper and subtract twice the wall to get the ID. Here’s the sequence for a rectangular tube based on Metals Depot’s documented method.

  1. Measure Height (A) — the longer outside face, for example 1 inch or 1.5 inches.
  2. Measure Width (B) — the shorter outside face, for example 0.5 inches or 0.75 inches.
  3. Measure Wall (C) — the thickness of the aluminum wall, for example 1/16 inch or 1/8 inch.
  4. Confirm the Alloy and Temper — stamped on the tube as 6061-T6, 6063-T52, or similar.

For structural work, always cross-reference the section modulus with the tube’s weight per foot to confirm load capacity.

Choosing The Right Alloy For The Job

Three alloys cover nearly all aluminum tubing applications. 6061-T6 is the structural standard — weldable, high strength, and available in drawn and extruded forms under ASTM B221 and B241. 6063-T52 is the architectural choice, favored for decorative anodized finishes and moderate loads. 7075 is the aerospace alloy, delivering the highest strength but with poor weldability and susceptibility to stress corrosion cracking. For general-purpose framing and supports, 6061-T6 is the default. For anodized handrails or visual-exposure work, 6063-T52 gives a cleaner surface finish.

Round And Rectangular Tubing Dimensions

When the project calls for round drawn tubing or rectangular extrusions rather than NPS pipe, the dimensions are written directly as OD × Wall (round) or Width × Height × Wall (rectangular). The table below pulls together common sizes across both shapes.

Type / Size Wall (inches) Weight (lbs/ft)
Round 3/16″ OD 0.022 0.014
Round 1/2″ OD 0.083 0.128
Round 1/2″ OD 0.120 0.169
Round 1-1/4″ OD 0.188 0.738
Round 2-1/4″ OD 0.375 2.598
Rect 0.500″ × 1″ 0.093 0.293
Rect 0.500″ × 2″ 0.125 0.672
Rect 0.750″ × 1.500″ 0.062 0.319
Rect 0.750″ × 1.500″ 0.125 0.600

Drawings should also specify the corner radius (such as 0.125 inches for square tube) and the required temper, because those details affect fit-up during welding and the final assembly tolerance.

Common Mistakes When Ordering Aluminum Tubing

Three errors show up most often on the shop floor. The first is confusing NPS with OD — ordering “1/2-inch pipe” when you need 0.840-inch fittings. The second is skipping the schedule designation and receiving standard-thickness pipe for a high-pressure application. The third is substituting 6063 for 6061 on a load-bearing frame because the price was lower. Check the alloy, the schedule, and the OD against your fittings before the order ships.

Quick Reference: Matching Dimensions To Your Build

Start with the application: structural frames demand 6061-T6 pipe or tube, architectural rails call for 6063-T52, and aerospace work needs 7075 with proper tempering. Match the NPS or direct OD to your connector size, then pick SCH40 for standard loads or SCH80 for heavier duty. Verify the weight per foot and section modulus against your load calculations. If you need a complete set of ready-to-buy options for a common build size, check our tested roundup of the best 1.5-inch aluminum tubing options with verified dimensions and pricing.

FAQs

What is the difference between NPS and actual OD?

NPS (Nominal Pipe Size) is a label, not a measurement. A 1/2-inch NPS pipe has an actual outer diameter of 0.840 inches. The OD only matches the nominal size at roughly NPS 12 and larger. Always reference the chart for the exact OD, especially when ordering fittings or threaded connections.

What schedule should I use for structural framing?

Schedule 40 is the standard choice for most structural and general-purpose aluminum pipe applications. Schedule 80 provides a thicker wall and higher pressure rating, and is recommended for heavy loads or where threading will reduce the wall thickness below safe limits.

Is 6061 or 6063 aluminum better for outdoor use?

6063 is commonly chosen for outdoor architectural work because it takes anodized finishes evenly and resists corrosion well in atmospheric exposure. 6061 offers higher strength but may not produce as uniform a cosmetic finish when anodized. For load-bearing outdoor structures, 6061 with a protective coating is the safer choice.

Can I weld 7075 aluminum tubing?

7075 aluminum is generally not recommended for welding. Its high zinc content makes it prone to hot cracking and porosity during the welding process. For fabrications that require welding, 6061-T6 or 6063 are the standard weldable alloys. Mechanical fastening or bonding is preferred for 7075 assemblies.

What does T6 temper mean on a tubing chart?

T6 denotes a heat-treated and artificially aged condition that increases the alloy’s strength. For 6061-T6, this means a minimum tensile strength of roughly 42,000 psi. The temper is stamped or printed on the tube alongside the alloy designation and must be specified when ordering to ensure the material meets the intended load requirements.